Proven outcomes

Projects That Speak for Themselves

50+ completed projects. 100% NABH first-attempt success. Here is a selection of the work we are most proud of.

50+
Projects Completed
100%
NABH First-Attempt Rate
14+
Years of Experience
8+
States Served
NABH Accreditation
Lucknow, Uttar Pradesh

100-Bed Multi-Speciality Hospital — NABH Full Accreditation

Duration: 14 months

Challenge

The hospital had been operating for 3 years without accreditation. Internal documentation was inconsistent, infection control protocols were not standardised, and staff had no prior exposure to NABH standards.

Outcome

NABH Full Accreditation achieved on the first assessment attempt. Zero major non-conformities raised. The hospital subsequently saw a 35% increase in insurance empanelment applications within 6 months of accreditation.

Key highlights
  • ✓First-attempt NABH accreditation
  • ✓120+ staff trained
  • ✓Zero major non-conformities
  • ✓35% increase in insurance empanelments
Turnkey Hospital
Kanpur, Uttar Pradesh

Greenfield 60-Bed Hospital — Turnkey Design to Handover

Duration: 18 months

Challenge

A healthcare group wanted to establish a new 60-bed multi-speciality hospital on a greenfield site. They needed a single partner to manage everything from architectural planning to equipment commissioning and staff training.

Outcome

Hospital opened on schedule and within budget. NABH Entry Level Certification achieved within 8 months of opening. The client has since commissioned a second hospital with us.

Key highlights
  • ✓On-time, on-budget delivery
  • ✓Single-partner accountability
  • ✓NABH Entry Level within 8 months
  • ✓Repeat client engagement
Modular OT
Jaipur, Rajasthan

4-Theatre Modular OT Complex — ISO 5 Commissioning

Duration: 10 weeks

Challenge

A 200-bed hospital needed to replace its ageing conventional operation theatres with a modern modular OT complex. The hospital could not afford a prolonged shutdown of surgical services during the transition.

Outcome

All four theatres commissioned within 10 weeks with zero disruption to the hospital's surgical schedule. Post-installation air quality testing confirmed ISO 5 compliance in all theatres.

Key highlights
  • ✓Zero surgical schedule disruption
  • ✓ISO 5 compliance confirmed
  • ✓10-week delivery
  • ✓Phased installation approach
Medical Gas Pipeline
Agra, Uttar Pradesh

MGPS Design & Installation — 150-Bed Hospital

Duration: 12 weeks

Challenge

A newly constructed 150-bed hospital required a complete medical gas pipeline system covering oxygen, nitrous oxide, medical air, surgical air, CO₂, and vacuum across 6 floors.

Outcome

MGPS commissioned and certified fully compliant with HTMX guidelines and NABH medical gas standards. The system has operated without incident since commissioning.

Key highlights
  • ✓6-gas system across 6 floors
  • ✓Full HTMX compliance
  • ✓Comprehensive commissioning testing
  • ✓Zero post-handover incidents
NABL Accreditation
Lucknow, Uttar Pradesh

Hospital Laboratory — NABL Accreditation

Duration: 10 months

Challenge

A 120-bed hospital's in-house laboratory was seeking NABL accreditation to qualify for government empanelment and improve patient confidence. The laboratory had no prior quality management system in place.

Outcome

NABL accreditation achieved on the first assessment. The laboratory subsequently qualified for 3 new government empanelment programmes, significantly increasing its revenue.

Key highlights
  • ✓First-attempt NABL accreditation
  • ✓ISO 15189 implementation
  • ✓3 new government empanelments
  • ✓Full staff training programme
Equipment Planning
Delhi NCR

Vendor-Neutral Equipment Planning — 80-Bed Hospital Expansion

Duration: 4 months

Challenge

A hospital expanding from 80 to 150 beds needed to procure medical equipment for new departments including cardiology, radiology, and critical care. Previous procurement had been vendor-driven, resulting in incompatible systems and overspending.

Outcome

Equipment procured at 18% below the hospital's initial budget estimate. All systems were compatible with existing infrastructure. The hospital avoided two vendor lock-in situations that would have cost significantly more in the long term.

Key highlights
  • ✓18% below budget
  • ✓Vendor-neutral approach
  • ✓Full tender management
  • ✓Long-term compatibility assured

Your Project Could Be Next

Tell us about your hospital planning, accreditation, or infrastructure challenge. We will tell you exactly how we can help.

Discuss Your Project